Reconstruction of the building complex of Klebelsberg Castle (construction of an exhibition area of 150 m2 in the Klebelsberg House and 30 rooms equipped with bathrooms in the guest house)

The reconstruction works of the building complex of the former Klebelsberg Castle involved the following, among others:

  • demolition works, clearing, earth and rock works
  • structural and concrete works, carpentry and scaffolding works
  • reconstruction of the roofing and roof tiles
  • floor slab construction
  • façade reconstruction
  • re-manufacture of door and window structures
  • reconstruction of the library room
  • reconstruction of the main staircase

NAME OF THE PROJECT:

Reconstruction works of Klebelsberg Castle in Pesthidegkút

 

LOCATION:

1028 Budapest, Templom u. 12-14.

 

TASK:

Reconstruction of the building complex of Klebelsberg Castle

 

FLOOR AREA:

1.400 m2

 

DURATION OF WORKS:

November 2015 – January 2017

 

CLIENT:

KIVING Ingatlangazdálkodó és Beruházásszervező Kft

Bertalan Árkay
(Budapest, 11 april 1901. – Budapest, 23 november 1971)

His architectural approach progresses from eclectic beginnings through Art Nouveau to modern avant-garde movements. Bertalan Árkay was one of the most commissioned architects for family home designs in the interwar period. Most of the family houses designed by him represent a high architectural standard. In addition to his design work, his competition projects also stand out. The most well-known among these is „Szent Korona útja and Vitézek tere építészeti megoldása”, with which he won the first prize. )(Today: Petőfi Bridge’s Buda bridgehead and the section of Irinyi József Road extending to Október 23 Street. It was realized in a fraction of the arrangement plan. This is demonstrated by the semicircular development visible at the intersection of the two roads.

A Klebelsberg-kastély épületegyüttesének felújítása